Feasibility study, predesign for highway linking eastern parishes under way
Published: Sunday March 30, 2014 | 10:31 am
A feasibility study and a preliminary design for a two-lane highway that would link eastern parishes to the north coast highway should be completed within the next three months.


Paul Marin -19 is one thing, 20 is a whole other matter. It gets even worse if they win the UCL. *groan*.
05/18/2011.MU fans naah cough, but all a unuh a vomit?-Lazie 1/11/2015
Comment